New business opportunities
5 cities nearby, 2-100 km away. Federal highway, airport, river port and rail junction
Rock sand quarry, sand and crushed stone storage grounds, main gas pipelines, oil pipeline, and ammonia pipeline.
Extensive possibilities to hook up and connect the required lines, collectors and transport lines to city sewage treatment plants.
Raw material base
— Rock sand quarry — 1.2 km
— River sand storage area — 7 km
— Granite rubble storage area — 7 km
— Main gas pipelines — 0.3 km
— Trunk oil pipeline — 9 km
— Trunk ammonia pipeline — 2 km
— Federal highway М-5 «Ural» (0,2 km)
— International Airport «Kurumoch» (35 km)
— River port «Togliatti» (7 km)
— Railway junction «Khimicheskiy» (3 km)
Engineering infrastructure
— Possibility to hook up to PJSC IDGC-Volga VL-110kV Power Line
— Trunk gas pipelines: Mokrous-Togliatti, Urengoy-Petrovsk,and Chelyabinsk-Petrovsk
— Connection to existing waste
collectors, within the boundaries of business facility, and transportation to city sewage treatment plants (2 km)
Togliatti City — 2 km
Zhigulevsk City — 5 km
Samara City — 65 km
Syzran City — 90 km
Dimitrovgrad City — 85 km
Description description
DEVELOPED LOGISTIC STRUCTURE
LAND OWNERSHIP TITLE
REGIONAL GOVERNMENT’S SUPPORT
COMPREHENSIVE DEVELOPMENT OF ENGINEERING INFRASTRUCTURE WITH DUE ACCOUNT OF RESIDENTS’ NEEDS
ENGINEERING-AND-TRANSPORTATION AND COMMUNAL AREAS (8, 8)
3 ha (Project Design — 25 ha)
LOGISTICS AND STORAGE AREA (1, 6, 7)
10 ha (Design Project — 19.62 ha)
PRODUCTION AREA (3, 4, 5)
20 ha (Project Design — 68.18 ha)
BUSINESS AND ADMINISTRATION AREA (2)
6.49 ha
According to The Comprehensive Plan for Modernization and Expansion of Main Infrastructure National Project, a 3.7 km bridge is being built across the Volga. The project provides for the construction of a motor road with a total length of 99.3 km, which will also pass through Samara Region territory, bypassing the city of Togliatti.
On the right bank of the Volga, the motor road will be connected to the approach branch from The Highway M-5 «Ural» to Ulyanovsk City, and on the left — to The Highway M-5 «Ural».
EXPLORE
our Offer
Maximum electrical load 5-20 MW
Heat consumption 6.5 — 63.0 Gca/hour
Water disposal 1720 — 5200 — 7800 thou m/day
Water consumption 1730 — 5590 — 8000 thou m/day
Gas consumption 1000 — 10000 m3/h
EXPLORE
our Offer
CONCLUSION OF INVESTMENT MEMORANDUM
When implementing investment projects worth
RR 650 mln and more
INCLUSION INTO THE LIST OF STRATEGIC
INVESTMENT PROJECTS
When implementing investment projects worth
1 billion rubles and more
FROM 0%
PROPERTY TAX
FROM 16,5%
INCOME TAX
EXPLORE
our Offer
ALL RIGHTS RESERVED 2021