ИНВЕСТИЦИОННЫЙ ПАРК СТАВРОПОЛЬСКИЙ

THE STAVROPOLSKY INVESTMENT PARK

New business opportunities        

01

geographical location

5 cities nearby, 2-100 km away. Federal highway, airport, river port and rail junction

02

material base

Rock sand quarry, sand and crushed stone storage grounds, main gas pipelines, oil pipeline, and ammonia pipeline.

03

developed engineering infrastructure

Extensive possibilities to hook up and connect the required lines, collectors and transport lines to city sewage treatment plants.

BENEFITS  OF LOCATIONS

Raw material base

— Rock sand quarry — 1.2 km
— River sand storage area — 7 km
— Granite rubble storage area — 7 km
— Main gas pipelines — 0.3 km
— Trunk oil pipeline — 9 km
— Trunk ammonia pipeline — 2 km

MAP OF REGION

— Federal highway М-5 «Ural» (0,2 km) 
— International Airport «Kurumoch» (35 km)
— River port «Togliatti» (7 km)
— Railway junction «Khimicheskiy» (3 km)

Engineering infrastructure

— Possibility to hook up to PJSC IDGC-Volga VL-110kV Power Line
— Trunk gas pipelines: Mokrous-Togliatti, Urengoy-Petrovsk,and Chelyabinsk-Petrovsk
— Connection to existing waste
collectors, within the boundaries of business facility, and transportation to city sewage treatment plants (2 km)

Togliatti City — 2 km
Zhigulevsk City — 5 km
Samara City — 65 km
Syzran City — 90 km
Dimitrovgrad City — 85 km

ABOUT THE PARK  FIGURES AND FACTS

FACTS ABOUT THE STAVROPOLSKY PARK

Description description

DEVELOPED LOGISTIC STRUCTURE

LAND OWNERSHIP TITLE

REGIONAL GOVERNMENT’S SUPPORT

COMPREHENSIVE DEVELOPMENT OF ENGINEERING INFRASTRUCTURE WITH DUE ACCOUNT OF RESIDENTS’ NEEDS

ENGINEERING-AND-TRANSPORTATION AND COMMUNAL AREAS (8, 8)

3 ha (Project Design — 25 ha)

LOGISTICS AND STORAGE AREA (1, 6, 7)

10 ha (Design Project — 19.62 ha)

PRODUCTION AREA (3, 4, 5)

20 ha (Project Design — 68.18 ha)

BUSINESS AND ADMINISTRATION AREA (2)

6.49 ha

CONSTRUCTION OF BRIDGE ACROSS THE VOLGA

According to The Comprehensive Plan for Modernization and Expansion of Main Infrastructure National Project, a 3.7 km bridge is being built across the Volga. The project provides for the construction of a motor road with a total length of 99.3 km, which will also pass through Samara Region territory, bypassing the city of Togliatti.

On the right bank of the Volga, the motor road will be connected to the approach branch from The Highway M-5 «Ural» to Ulyanovsk City, and on the left — to The Highway M-5 «Ural».

Проиграть видео

ENGINEERING INFRASTRUCTURE

POWER SUPPLY

Maximum electrical load 5-20 MW

Heat consumption 6.5 — 63.0 Gca/hour

WATER DISCHARGE

Water disposal 1720 — 5200 — 7800 thou m/day

Water supply

Water consumption 1730 — 5590 — 8000 thou m/day

GAS SUPPLY

Gas consumption 1000 — 10000 m3/h

SPECIALIZATIONS 

PRODUCTION OF CONSTRACTION MATERIALS

WAREHOUSE LOGISTICS

WAREHOUSE LOGISTICS

ENTERPRISES OF CHEMICAL AND PHARMACOLOGICAL INDUSTRY

ENERGY PRODUCTIONS AND ENTERPRISES USING NATURAL GAS AS RAW MATERIAL

PRODUCTION OF AUTO COMPONENTS

PROJECT  IMPLEMENTATION

4 easy steps to get the result

1
MEET INVESTOR
2
SITE SELECTION AND SUPPORT MEASURES
3
PROJECT STRUCTURING AND INVESTOR SUPPORT
4
LAUNCH ENTERPRISE

SUPPORT TO  INVESTORS

PROPERTY

CONCLUSION OF INVESTMENT MEMORANDUM

When implementing investment projects worth
RR 650 mln and more

INCLUSION INTO THE LIST OF STRATEGIC
INVESTMENT PROJECTS

When implementing investment projects worth
1 billion rubles and more

FINANCIAL

FROM 0%

PROPERTY TAX

FROM 16,5%

INCOME TAX

OUR  CONTACTS

ALL RIGHTS RESERVED 2021

ОСТАВИТЬ ЗАЯВКУ